INFRASTRUCTURE

Tafelberg Road

2023 – 2025
Client : City of Cape Town
Value : R45 M
Scope of works : The rehabilitation of Tafelberg Road which serves as the main access to Table Mountain Nature Reserve and the cableway; construction starts at the intersection with Kloofnek Road and ends near the lower cableway station

  • Rehabilitation of the existing pavement base layer and wearing course.
  • The resurfacing and upgrade of pre-existing parking facilities.
  • Construction of several block paved sidewalks and a pedestrian walkway built of timber.
  • The rehabilitation of sub-soil drainage and stormwater infrastructure.
  • Construction of new brick, concrete and stone clad retaining walls as well as rehabilitation of barrier structures.
  • Building of a new gabion retaining structure with a concrete barrier wall.
  • Rehabilitation of existing sewer pipelines and installation of a pulled in CIPP lining.